Skip to content

Zenith 2020

Plan and Play

Plan and Play

Home » Zenith Build » Zenith 2020 » Nose Bowl and Cowling setup DONE !

Social links

Recent News

  • First Flight – DONESKI
  • A quick blurb from Experimental Aircraft Channel
  • Prepare for AWC – Airworthiness Cert by FAA / FSDO
  • Finalizing the Instrument Panel
  • How about Painting my TukTuk

Aircraft Build Time

Airplane sectionBuild time (hrs)
Avionics59
Electricals6
Elevator26
Engine118.5
Finishing185
Firewall forward138.5
Flaperons58.5
Fuel and Brake lines17
Fuselage190
Landing gear20.5
Miscellaneous15
Rudder10.5
Tail Unit67
Wings94
Total1005.5

Nose Bowl and Cowling setup DONE !

May 22, 2021  in Zenith 2020  tagged Firewall forward by Nori (updated on May 28, 2021)

Pictures are worth 1000 times more than mere words…

Officially I am done with Nosebowl and Cowling kit assembly … DONE DONE and DONE


Post navigation

  • ← Corvair Cowling development
  • Nosebowl and Cowling installation →

· © 2022 Zenith 2020 · Powered by · Designed with the Customizr theme ·